Posted on

BORING MACHINE

BORING MACHINE BORING MACHINE
 

BORING MACHINE about 8.5 miles south of Highway 5 is in place and preparing to bore a 500 foot run of 12" pipe from the pump station to the Madoc elevated tank. During system pressure testing, a leak was discoverd in the pipe which had been bored beneath the small wetland area earlier this year (just off the nose of the white truck). The 500 feet runs from the end of the boring machine in foreground to the yellow track...